1. You will only have 30 to 40 minutes (See curing estimates chart) to apply your coating material (after Part A and Part B are mixed together) to the surfaces before the coating material starts to harden.
  2. In order to begin coating, the substrate must be dry which is generally not achievable without having the dew point temperature being at least 5°C or 10°F below the substrate temperature.